• UK +44(0)1782 764428
  • US 518-382-0082

You are here: Home » Construction » Offsite & Modular Buildings » Factory Production Control

Factory Production Control

Lucideon holds a Notified Body status under the Construction Products Regulations (CPR) for Certification of Factory Production Control under ISO / IEC 17065. 

A Factory Production Control system should provide a framework to ensure consistency and traceability in methods, materials, equipment and training.  This is achieved through a system of documented procedures, inspections, tests and records relating to everything from purchasing and goods in, to calibration and maintenance of equipment.  This third party audit scheme is necessary when attaining final third party certification or insurance for the use of the system in a construction project.

Contact us

Get in touch

Resources

  • Guidance Document

    Test Specification for Precast Concrete Wall Panels for Use in Domestic Construction
    pdf (906 KB)

  • Guidance Document

    Test Specification for Structural Insulated Panels (SIPs) in Load Bearing Wall Panels
    pdf (975 KB)

  • White Paper

    Digital Image Correlation for Construction
    pdf (903 KB)

  • Guidance Document

    Creating Comfortable Conditions in Buildings
    pdf (2.27 MB)

  • Data Sheet

    • Offsite & Modular Buildings Services Portfolio

    Download PDF